The project consists of the micro-milling of bridge decks, repairs to rutted sections of pavement, and the replacement of catch basin structures, median barriers and bridge joints. The entire section of I-91 will then be overlaid with a thin surface treatment known as Ultra-thin bonded HMA which is one of several pavement preservation strategies used by the Department to extend the service life of the existing highway system.